March 6, 2017
Professional photos are complete, house goes on the market Thursday.
March 6, 2017
March 6, 2017
February 19, 2017
A little more paint and cleaning and we will be all done.
February 19, 2017
A little more paint and cleaning and we will be all done.
January 25, 2017
Floors are done.
January 22, 2017
January 20, 2017
Trim is going up
January 15, 2017
Hardwoods are stripped and ready for stain.
January 9, 2017
Hardwood flooring is next!
December 31, 2016
Trim out and paint continued
December 29, 2016
All flooring cover has been removed and interior trim is in process.
December 1, 2016
Not only did this house have several layers of shingles, but it has several layers of vinyl, plywood and cardboard over the hardwood flooring beneath.
November 10, 2016
Discovered hard wood flooring under a layer plywood, cardboard, LVT vinyl & glue. #jackPot
November 7, 2016
Painting continues. Rest of foundation and lattice board will also be painted grey to match deck. Red seemed like the only appropriate door color to pair with the existing yellow/green exterior color scheme. New programmable thermostat added.
November 5, 2016
Back of the house is sealed up ready for some pressure washing. Painting is almost complete. Built-in cabinets in bedroom 3 were a great touch we are cleaning, painting and leaving in.
November 3, 2016
New “Madura Gold” laminate countertops are in. Extended the lip on the bar top 3 inches to maximize as much countertop space as possible.
October 31, 2016
Cabinets are in and countertops are stripped.
October 25, 2016
Pressure washing of exterior & driveway beginning, as well as Kitchen upfit.
October 24, 2016
Final bedroom repair/insulation/framing being done. Dry wall and paint for these areas is on deck.
October 24, 2016
Yard continues to shape up, interior paint also started.
October 22, 2016
Definitely biggest day as far as visual progress. New roof installed and obtrusive tree removed.
October 22, 2016
Roof Leak & Interior Moisture came from old back roof vents as you can see the difference in the front and back of the house after shingles were removed. There was also no roof flashing installed and one of several layers of shingle angled behind vinyl @ rear of property, slowly water logging and ruining the wall system below.
October 22, 2016
House finally has street visibility after taking out tree, Framing: house wrapping continues .
October 21, 2016
Framing of the new rear wall begins. Starting of demolition in bedroom 3 removing dry wall to assess amount of water damage . Shingles delivered, roof will begin tomorrow.
October 19, 2016
Demolition of back wall, water damage compromised the entire wall system. Termite inspection conducted again by pest control company to confirm we are in the clear. (Second Inspection OpInion)
October 19, 2016
Removed all miscellaneous trash & debris.
October 19, 2016
October 19, 2016